To remove the old bathroom completely out and replace with new fixtures and fittings.
to include all tiling walls and flooring. To plaster ceiling to include spotlights and extractor
fan. Also to include heated towel rail and cabinets. The bathroom is 8 feet x 7 feet with no
windows. We are in houghton regis / dunstable. If possible we would like the work to start
in August.